Close Menu
    What's Hot

    Boao Forum: CRRC Zhuzhou Institute Outlines Core Technologies and Application-Driven Innovation for Green Industry Growth

    August 4, 2026

    Canadian economy grew 0.3% in May report

    August 1, 2026

    Australia reforms National Disability Insurance Scheme rules

    August 1, 2026
    Facebook X (Twitter) Instagram
    Khartoum ReportKhartoum Report
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Khartoum ReportKhartoum Report
    Home » Arctech Inks 1.5GW Solar Tracker Supply Deal for the Biggest Solar Plant in the Middle East
    PR Newswire

    Arctech Inks 1.5GW Solar Tracker Supply Deal for the Biggest Solar Plant in the Middle East

    April 11, 2023
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email

    JEDDAH, Saudi Arabia, April 11, 2023 /PRNewswire/ — Arctech, the world’s leading solar tracking, racking, and BIPV provider has announced it is poised to provide 1.5GW SkyLine II solar tracking solution for ASB project in Saudi Arabia, marking the company’s first solar tracking and racking project in the country and a milestone of its increasing presence in Middle East.

    Arctech SkyLine II

    Located in the Al Shubakh district, Jeddah City, Mecca, Saudi Arabia, the ASB project is the biggest solar plant in construction in the Middle East region serving the purpose of expediting regional energy transition to spell out the “Vision 2030”.

    The KSA government is actively expediting the regional energy transition, as Saudi Arabia is aiming for 50% of its energy to be generated from renewable sources by 2030, which means 27.3GW of renewable energy installation, the Saudi Public Investment Fund has invested around SR1.5 trillion (US$400 billion) since 2016 in alternative energy. Saudi Arabia aims to employ clean technologies and renewable energy to reduce its projected 2030 emissions by more than 130 million tonnes and lessen Saudi Arabia’s contribution to global emissions, which currently account for more than 4% of all planet-wide emissions.

    .Arctech has a series of trackable project portfolios in the region following the “One Belt One Road” initiative including the IBRI II 607MW project in Oman and the 2.1GW Al Dhafra PV2 project in Abu Dhabi among others, the company has established branches in Saudi Arabia and The United Arab Emirates to deepen localization and offer white-glove services to regional clients.

    2.1GW Al Dhafra PV2 Project in Abu Dhabi

    Arctech has a long-term good rapport with ASB project owner ACWA Power and EPC China Energy Engineering Group Co., Ltd. (hereafter “CEEC”). In February, the company welcomed the senior management from ACWA Power and China Energy Engineering Group Co., Ltd. (hereafter “CEEC”) at a business meeting in Arctech’s headquarters, Kunshan, China, during the visit, Mohammad A. Abunayyan, Chairman of ACWA Power remarked: “Arctech and ACWA Power have carried out fruitful cooperation on previous projects, we expect to strengthen cooperation and innovate the cooperation mode with ACWA Power under the Road and Belt Initiative and Saudi Arabia’s Vision 2030, becoming a pair of role models for Belt and Road cooperation.”

    Photo – https://mma.prnewswire.com/media/2051408/Arctech_SkyLine_II.jpg
    Photo – https://mma.prnewswire.com/media/2051409/2_1GW_Al_Dhafra_PV2_Project_in_Abu_Dhabi.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/arctech-inks-1-5gw-solar-tracker-supply-deal-for-the-biggest-solar-plant-in-the-middle-east-301794227.html

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

    Related Posts

    Boao Forum: CRRC Zhuzhou Institute Outlines Core Technologies and Application-Driven Innovation for Green Industry Growth

    August 4, 2026

    Sungrow Powers Sierra Leone’s Energy Transformation with First National-Scale Power Project

    July 31, 2026

    Investec Selects Infosys Finacle SaaS Platform on Microsoft Azure for Digital Banking Transformation

    July 30, 2026
    Latest News

    Canadian economy grew 0.3% in May report

    August 1, 2026

    Australia reforms National Disability Insurance Scheme rules

    August 1, 2026

    India commits 84084 crore rupees to offshore energy security

    August 1, 2026

    India commits 84084 crore rupees to offshore energy security

    August 1, 2026

    Apple market cap reaches 4.94 trillion to top Nvidia

    July 29, 2026
    © 2026 Khartoum Report | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.